Back to the change radar
Permanent observed change record

Reported field changed

2000290236 SL DevOps Foundation

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
24 November 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-653f5540-294f-482e-8b98-fc4c1fdf5b70
Observation revision
129

Exact before / after evidence

What changed in the public projection

01

current Reported Values › reported › items

Before

13,550 EUR

After

17,253.75 EUR

02

Official events

Before

33

After

34

03

Latest publication date

Before

2026-11-15

After

2026-11-24

04

Notices

Before

29

After

30

05

Latest official URL

Before

https://oeffentlichevergabe.de/ui/de/search/details?noticeId=d95bdbdf-0ede-40fe-ab40-9552c45f9164

After

https://oeffentlichevergabe.de/ui/de/search/details?noticeId=7509b998-17cb-4915-90c5-4e7bfe8f3478

06

Title

Before

2000289318 SL IBM Cloud Pak for AIOps v4.10: Installation (TN405G)

After

2000290236 SL DevOps Foundation

07

Versions

Before

33

After

34

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    contract7509b998-17cb-4915-90c5-4e7bfe8f3478 · 7509b998-17cb-4915-90c5-4e7bfe8f3478
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): 2000290236 SL DevOps Foundation — observed public AI procurement change, observed 25 November 2026. https://i6eal.de/en/ki-vergabe/aenderung/field-changed-b7d24f9ad9d0c14b905beea0/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar