Back to the change radar
Permanent observed change record

Reported field changed

2000281700 SL Power Camp CCNA

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
13 August 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-653f5540-294f-482e-8b98-fc4c1fdf5b70
Observation revision
27

Exact before / after evidence

What changed in the public projection

01

current Reported Values › reported › items

Before

32,940 EUR

After

38,500 EUR

02

Official events

Before

9

After

10

03

Latest publication date

Before

2026-08-09

After

2026-08-13

04

Notices

Before

9

After

10

05

Latest official URL

Before

https://oeffentlichevergabe.de/ui/de/search/details?noticeId=48225979-bcb3-47a4-adf9-b9770c691b0b

After

https://oeffentlichevergabe.de/ui/de/search/details?noticeId=10d53719-8e82-44ee-a692-12f54b22d55d

06

Title

Before

2000281647 SL NetApp ONTAP Clustered (cDOT) 9.14 Administration

After

2000281700 SL Power Camp CCNA

07

Versions

Before

9

After

10

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    contract10d53719-8e82-44ee-a692-12f54b22d55d · 10d53719-8e82-44ee-a692-12f54b22d55d
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): 2000281700 SL Power Camp CCNA — observed public AI procurement change, observed 14 August 2026. https://i6eal.de/en/ki-vergabe/aenderung/field-changed-45c721464d822d6e70fe06b9/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar