Back to the change radar
Permanent observed change record

Procedure newly observed

Anwendungsentwicklungsleistungen mit .NET, Java und verwandten Technologien in 5 Losen

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
18 May 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-22d08841-5463-4488-b3b0-ebfb609081c2
Observation revision
94

Exact before / after evidence

What changed in the public projection

01

state

Before

Not reported

After

observed

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    contract384a48c8-a4be-43a1-9255-fb4c3969942d · 384a48c8-a4be-43a1-9255-fb4c3969942d
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): Anwendungsentwicklungsleistungen mit .NET, Java und verwandten Technologien in 5 Losen — observed public AI procurement change, observed 21 October 2026. https://i6eal.de/en/ki-vergabe/aenderung/procedure-observed-75c6f8350d515042d7e1ae66/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar