Back to the change radar
Permanent observed change record

Official event added

Projekt 1023: Prüfkriterien für Reinforcement Learning (RL-Criteria)

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
21 August 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-859cb8ae-5298-4dab-b22e-fcc0936c7668
Observation revision
36

Exact before / after evidence

What changed in the public projection

01

events › national-procedure-e04426ce5eaec31728547a620e548fe6-event-36295e55392d1a8a352bd431

Before

Not reported

After

event Type: tender · notice Id: ocds-mnwr74-859cb8ae-5298-4dab-b22e-fcc0936c7668 · version Id: legacy-v1

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    tenderocds-mnwr74-859cb8ae-5298-4dab-b22e-fcc0936c7668 · legacy-v1
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): Projekt 1023: Prüfkriterien für Reinforcement Learning (RL-Criteria) — observed public AI procurement change, observed 23 August 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-cfcfdd4f1daf6c4a4eb8f2c5/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar