Back to the change radar
Permanent observed change record

Official event added

Rahmenvertrag zur Sicherstellung des Betriebs und die (Weiter-)Entwicklung des Produktes PMflexOne

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
24 September 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-73d55aca-8156-47b5-a98d-bc718376c7a0
Observation revision
69

Exact before / after evidence

What changed in the public projection

01

events › national-procedure-9eff571f69a87717549fe9242763d5de-event-c3e34dc92ff432b0864b0ce3

Before

Not reported

After

event Type: contract · notice Id: 40dd3ba9-18a1-4731-86a5-9e9ee6a449ca · version Id: 40dd3ba9-18a1-4731-86a5-9e9ee6a449ca

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    contract40dd3ba9-18a1-4731-86a5-9e9ee6a449ca · 40dd3ba9-18a1-4731-86a5-9e9ee6a449ca
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): Rahmenvertrag zur Sicherstellung des Betriebs und die (Weiter-)Entwicklung des Produktes PMflexOne — observed public AI procurement change, observed 25 September 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-cd6eb9a052cfa2f7a8b5ac3c/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar