events › ted-procedure-30acb068b0107a98784b70683859a4f0-event-ef65dd4b61141037a269656e
Not reported
event Type: contract · notice Id: 06f8e516-1cff-40f6-81a0-5c36f1ec7b66 · version Id: 1
Official event added
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
Not reported
event Type: contract · notice Id: 06f8e516-1cff-40f6-81a0-5c36f1ec7b66 · version Id: 1
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
06f8e516-1cff-40f6-81a0-5c36f1ec7b66 · 1Interpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Deutschland – Dienstleistungen von Architekturbüros – Sanierung Labor- und Bürogebäude Robert-Hooke-Str. 5 am Standort DLR Bremen - Leistungen der Objektplanung Freianlagen gemäß §§ 38 ff. HOAI, Leistungsphasen 3-8 — observed public AI procurement change, observed 3 November 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-cd3abb61f0b52254ba379f11/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools cover related ground.