events › ted-procedure-83ca7c08440466726e1208680cb7b8f9-event-8d38675464e5883698d8bea0
Not reported
event Type: contract · notice Id: 4254755a-f89e-47b7-8f48-21e98d95dd7f · version Id: 1
Official event added
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
Not reported
event Type: contract · notice Id: 4254755a-f89e-47b7-8f48-21e98d95dd7f · version Id: 1
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
4254755a-f89e-47b7-8f48-21e98d95dd7f · 1Interpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Deutschland – Elektronische Ausstattung – Beschaffung einer "didaktischen Schulungswand" - Zubehör (Los 5) — observed public AI procurement change, observed 25 August 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-b3aea59f72f67ee251cc6111/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools complement the current result.