Back to the change radar
Permanent observed change record

Official event added

Studie Zukunftsprojektion und Entwicklungspotentiale der Kultur- und Kreativwirtschaft 2037

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
9 September 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-cc67b8d7-5d79-40c8-ba47-2d911423d5de
Observation revision
55

Exact before / after evidence

What changed in the public projection

01

events › national-procedure-37126f69a17649b833be1949b79faee8-event-b6f108b151078eda30f32b53

Before

Not reported

After

event Type: tender · notice Id: ocds-mnwr74-cc67b8d7-5d79-40c8-ba47-2d911423d5de · version Id: legacy-v1

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    tenderocds-mnwr74-cc67b8d7-5d79-40c8-ba47-2d911423d5de · legacy-v1
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): Studie Zukunftsprojektion und Entwicklungspotentiale der Kultur- und Kreativwirtschaft 2037 — observed public AI procurement change, observed 11 September 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-a873218aebb0087ca1c44c0d/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar