events › national-procedure-89fc1802a66c86bcbc681dbdd770a749-event-0230d02b28bb6edf92f3a356
Not reported
event Type: contract · notice Id: c6cf975a-990c-427c-be64-4e156774cbed · version Id: c6cf975a-990c-427c-be64-4e156774cbed
Official event added
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
Not reported
event Type: contract · notice Id: c6cf975a-990c-427c-be64-4e156774cbed · version Id: c6cf975a-990c-427c-be64-4e156774cbed
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
c6cf975a-990c-427c-be64-4e156774cbed · c6cf975a-990c-427c-be64-4e156774cbedInterpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Los 1 IH Kirschhofener Tunnel und Los 2 IH Kalkofener Tunnel — observed public AI procurement change, observed 5 November 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-a80a3bc318a1dd703f74121a/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools cover related ground.