events › national-procedure-f463486b47b3a2c73b585ab039696fcf-event-55918353a777d1f79bcae4d3
Not reported
event Type: tender · notice Id: ocds-mnwr74-fa34f5b5-26bb-45e4-8b37-2057703724cf · version Id: legacy-v1
Official event added
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
Not reported
event Type: tender · notice Id: ocds-mnwr74-fa34f5b5-26bb-45e4-8b37-2057703724cf · version Id: legacy-v1
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
ocds-mnwr74-fa34f5b5-26bb-45e4-8b37-2057703724cf · legacy-v1Interpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Neubau MINT-Zentrum Dillingen - Leistungen der Tragwerksplanung, LPH 1-6 gemäß §§ 49 ff. HOAI — observed public AI procurement change, observed 29 November 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-8ff1dc890360c1121630edd5/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools cover related ground.