Back to the change radar
Permanent observed change record

Official event added

Fortführung und Skalierung der Work-Management-Plattform Asana

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
4 November 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-281e8004-fab0-4b67-aa0e-bcd119ba8729
Observation revision
109

Exact before / after evidence

What changed in the public projection

01

events › national-procedure-a4a764d29cfd19a6fb5bb94b282e1f48-event-366e941f6e5a68ccd4ecbfc2

Before

Not reported

After

event Type: contract · notice Id: 52d6b98c-b775-4a0d-a7a9-70b931d05de8 · version Id: 52d6b98c-b775-4a0d-a7a9-70b931d05de8

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    contract52d6b98c-b775-4a0d-a7a9-70b931d05de8 · 52d6b98c-b775-4a0d-a7a9-70b931d05de8
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): Fortführung und Skalierung der Work-Management-Plattform Asana — observed public AI procurement change, observed 5 November 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-8762e4ba32a2e6445d2da0e3/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar