events › national-procedure-92caec5f20a6e797084b3680b471c1d7-event-85386dbc78f4422a6de7a872
Not reported
event Type: contract · notice Id: fd03d71c-679a-45da-be87-929265ee651a · version Id: fd03d71c-679a-45da-be87-929265ee651a
Official event added
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
Not reported
event Type: contract · notice Id: fd03d71c-679a-45da-be87-929265ee651a · version Id: fd03d71c-679a-45da-be87-929265ee651a
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
fd03d71c-679a-45da-be87-929265ee651a · fd03d71c-679a-45da-be87-929265ee651aInterpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Schienengate (OCR-Anlage) zur Erfassung von Zugdurchfahrten und optischen Merkmalen — observed public AI procurement change, observed 14 October 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-6f4198fb5a08893e81b86776/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools cover related ground.