events › ted-procedure-59767a2fbfb56f30c2bea26886f59c31-event-325670aa170d450609f0bf37
Not reported
event Type: contract · notice Id: 10d53719-8e82-44ee-a692-12f54b22d55d · version Id: 1
Official event added
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
Not reported
event Type: contract · notice Id: 10d53719-8e82-44ee-a692-12f54b22d55d · version Id: 1
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
10d53719-8e82-44ee-a692-12f54b22d55d · 1Interpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Deutschland – Ausbildung – 2000281700 SL Power Camp CCNA — observed public AI procurement change, observed 13 August 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-6bb009ecae713c41e2d94343/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools complement the current result.