events › national-procedure-89fc1802a66c86bcbc681dbdd770a749-event-e6970fa7c2fbb59e7802f645
Not reported
event Type: tender · notice Id: ocds-mnwr74-79707ec8-4dfb-409e-b374-a6a886af893f · version Id: legacy-v1
Official event added
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
Not reported
event Type: tender · notice Id: ocds-mnwr74-79707ec8-4dfb-409e-b374-a6a886af893f · version Id: legacy-v1
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
ocds-mnwr74-79707ec8-4dfb-409e-b374-a6a886af893f · legacy-v1Interpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Los 1 IH Kirschhofener Tunnel und Los 2 IH Kalkofener Tunnel — observed public AI procurement change, observed 2 August 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-4efc998402b60b37fb651e83/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools complement the current result.