events › national-procedure-89fc1802a66c86bcbc681dbdd770a749-event-c15bfa5b6d81a08423dfb4eb
Not reported
event Type: contract · notice Id: 32bda4b6-967c-4095-956f-0e056dce3d44 · version Id: 32bda4b6-967c-4095-956f-0e056dce3d44
Official event added
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
Not reported
event Type: contract · notice Id: 32bda4b6-967c-4095-956f-0e056dce3d44 · version Id: 32bda4b6-967c-4095-956f-0e056dce3d44
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
32bda4b6-967c-4095-956f-0e056dce3d44 · 32bda4b6-967c-4095-956f-0e056dce3d44Interpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Los 1 IH Kirschhofener Tunnel und Los 2 IH Kalkofener Tunnel — observed public AI procurement change, observed 1 October 2026. https://i6eal.de/en/ki-vergabe/aenderung/official-event-added-37c8558adaf66a6b622e86b3/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools cover related ground.