Official events
7
8
Reported field changed
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
7
8
2026-09-30
2026-11-04
4
5
https://oeffentlichevergabe.de/ui/de/search/details?noticeId=32bda4b6-967c-4095-956f-0e056dce3d44
https://oeffentlichevergabe.de/ui/de/search/details?noticeId=c6cf975a-990c-427c-be64-4e156774cbed
7
8
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
c6cf975a-990c-427c-be64-4e156774cbed · c6cf975a-990c-427c-be64-4e156774cbedInterpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Los 1 IH Kirschhofener Tunnel und Los 2 IH Kalkofener Tunnel — observed public AI procurement change, observed 5 November 2026. https://i6eal.de/en/ki-vergabe/aenderung/field-changed-cff3df741d8fe27380bc89cc/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools cover related ground.