Back to the change radar
Permanent observed change record

Reported field changed

Lieferung, Montage und Inbetriebnahme von 2 GPU-basierten KI-Hochleistungssystemen - PR1272001 - 3150 - I

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
16 October 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-3220a9c8-6fb4-4d99-96d0-cd882b5fe82f
Observation revision
91

Exact before / after evidence

What changed in the public projection

01

Official events

Before

2

After

3

02

Latest publication date

Before

2026-09-20

After

2026-10-16

03

Latest observed event

Before

tender

After

modification

04

Notices

Before

2

After

3

05

Latest official URL

Before

https://oeffentlichevergabe.de/ui/de/search/details?noticeId=1550b433-240c-4457-88e3-1453666c9d30

After

https://oeffentlichevergabe.de/ui/de/search/details?noticeId=6bc23366-4ec0-40b8-831d-3d2b08378cbc

06

reported Object Counts › modifications

Before

0

After

1

07

Versions

Before

2

After

3

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    modification6bc23366-4ec0-40b8-831d-3d2b08378cbc · 6bc23366-4ec0-40b8-831d-3d2b08378cbc
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): Lieferung, Montage und Inbetriebnahme von 2 GPU-basierten KI-Hochleistungssystemen - PR1272001 - 3150 - I — observed public AI procurement change, observed 17 October 2026. https://i6eal.de/en/ki-vergabe/aenderung/field-changed-afbb9004b6eb0e21a75fd595/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar