Back to the change radar
Permanent observed change record

Reported field changed

Lieferung, Montage und Konfiguration eines redundanten Storage-Systems

This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.

Observed
Official source date
23 October 2026
Source system
National OCDS data
Official procedure identifier
national:ocds-mnwr74-a33d5196-ee7b-423a-985b-b5e743d909e3
Observation revision
97

Exact before / after evidence

What changed in the public projection

01

current Reported Values › reported › items

Before

Not reported

After

1 EUR

02

current Reported Values › reported › reported

Before

No

After

Yes

03

current Reported Values › reported › total

Before

0

After

1

04

Official events

Before

2

After

3

05

Latest publication date

Before

2026-08-26

After

2026-10-23

06

Latest observed event

Before

tender

After

contract

07

Notices

Before

2

After

3

08

Latest official URL

Before

https://oeffentlichevergabe.de/ui/de/search/details?noticeId=a33d5196-ee7b-423a-985b-b5e743d909e3

After

https://oeffentlichevergabe.de/ui/de/search/details?noticeId=b1e9a505-364e-4557-b5a9-18b74fbfa57b

09

reported Object Counts › awards

Before

0

After

1

10

reported Object Counts › contracts

Before

0

After

1

11

Versions

Before

2

After

3

Official evidence

Inspect the source publication

These links were retained with the observed source claim. Open them to inspect the official context.

  1. 01
    contractb1e9a505-364e-4557-b5a9-18b74fbfa57b · b1e9a505-364e-4557-b5a9-18b74fbfa57b
    Open official source ↗

Interpretation boundary

Observed is not the same as changed by the authority at that moment

The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.

Permanent references

Use the evidence directly

i6eal (2026): Lieferung, Montage und Konfiguration eines redundanten Storage-Systems — observed public AI procurement change, observed 24 October 2026. https://i6eal.de/en/ki-vergabe/aenderung/field-changed-6d39426c838b81e221abdc61/

Compare the current public change window

The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.

Back to the change radar