Official events
3
5
Reported field changed
This record documents what the collector observed between two complete public procedure snapshots. Observation time and official publication time remain separate.
Exact before / after evidence
3
5
2026-07-29
2026-09-30
2
4
https://oeffentlichevergabe.de/ui/de/search/details?noticeId=240f3dbd-6121-4e46-aa81-39d86822b708
https://oeffentlichevergabe.de/ui/de/search/details?noticeId=32bda4b6-967c-4095-956f-0e056dce3d44
3
5
Official evidence
These links were retained with the observed source claim. Open them to inspect the official context.
947d8555-7578-4e4b-becd-e9ec4c90ab7a · 947d8555-7578-4e4b-becd-e9ec4c90ab7a32bda4b6-967c-4095-956f-0e056dce3d44 · 32bda4b6-967c-4095-956f-0e056dce3d44Interpretation boundary
The timestamp above marks when our daily collector first saw this difference. It does not reconstruct when an authority edited a field. A missing record is never described as deleted or cancelled unless an official notice says so.
Permanent references
i6eal (2026): Los 1 IH Kirschhofener Tunnel und Los 2 IH Kalkofener Tunnel — observed public AI procurement change, observed 1 October 2026. https://i6eal.de/en/ki-vergabe/aenderung/field-changed-2e5db7301dade3ebe9392582/The radar groups the bounded working set by observation day, source and field. Earlier permanent records remain discoverable through the cumulative archive.
These tools cover related ground.